• Skip to Management
  • Skip to Main menu
  • Skip to Page content
Adlershof Logo
  • WISTA
  • WISTA.Plan
  • WISTA.Service
WISTA direkt
Search
  • de
  • en
  • Adlershof Logo
  • About / Directory
    • Companies / Institutes
    • Science City in numbers
    • Direction / Maps
      • Bus / Train
      • By Car
      • Bicycle
      • Orientation / Maps
      • Trail of Thoughts
  • Newsroom
    • Overview
    • News
      • Social Media Stream
      • Success Stories
    • Events / Calendar
      • Adlershof Dissertation Award
      • Adlershof Research Forum
      • Long Night of Sciences Berlin
    • Adlershof Journal
    • Hot Topics
      • Adlershof Mission "Grand Challenges"
      • Circular Economy
      • Digital infra­structure / 5G campus network
    • Photos / Flyer / Downloads
      • Magazine archive
    • WISTA-Editorial Staff
  • Science / Technology
    • Overview
    • Technology Centres
      • Photonics / Optics
      • Biotech­nology / Envi­ron­ment
      • Micro­systems / Materi­als
      • IT / Media
      • Renewable Energy / Photovoltaics
    • Non-university Research
    • Universities / Colleges
      • Humboldt-Universität zu Berlin
      • Services for Students
    • Young Talents / STEM / School Labs
    • Start-Ups
      • Adlershof Start-Up Centre IGZ
      • Adlershof Founder’s Lab
    • Networks / Management
      • Campus Club Adlershof
  • TV / Media
    • TV and Movie Production
    • Media Services / Companies
    • News and Events
    • Filming Locations
    • Costume Hire
    • GDR Film Archive
    • Tickets / Booking
  • Properties
    • Overview
    • Real Estate Rent
      • Office Space / Workspace / Laboratories
    • Real Estate Offers
      • Commercial Properties
    • ST3AM Working Environments / Coworking
    • Residential
    • Construction
      • Building Projects
      • Architecture
      • Webcam
  • Service
    • Overview
    • Gastronomy / Sport / Culture / Shopping
    • Jobs / Market
    • Social and Healthcare Facilities
    • WISTA-Business Services
    • Event Services / Guided Tours / Hotels
    • Facility Management
    • Downloads / Photos / Videos
    • Jobs for Refugees
  • Hood
    • Overview
    • History
    • Nature Park
    • Culture
    • Technology Park
    • Digital Tours
  • WISTA
  • WISTA.Plan
  • WISTA.Service
WISTA direkt

News

  • Overview
  • News
  • Events / Calendar
  • Adlershof Journal
  • Hot Topics
  • Photos / Flyer / Downloads
  • WISTA-Editorial Staff
  • Adlershof
  • Newsroom
  • News
22. October 2012

SOLON is Building a 2 MW Solar Power Plant on a Landfill in Thuringia

SOLON Energy GmbH has been awarded the contract to build a photovoltaic power plant with a total capacity of 2 MW on an abandoned landfill in Jena-Ilmnitz (Thuringia). At the behest of the city of Jena, SOLON is planning the power plant, installing it so that it is ready to use, and is also responsible for commissioning it. The investment amounts to around four million euros, including the development of the land and of the project.

The plant is being built on an area of about four hectares; 8,360 polycrystalline solar modules with fixed mountings will be used. The yield can provide up to 1,400 households in Jena with electricity generated in a climate-friendly manner.

“Like the city of Jena, more and more communities are taking control of the energy revolution themselves,” says Dr. Lars Podlowski, managing director of SOLON Energy GmbH. “Solar power is particularly suitable for this. The plants can be installed quickly, and unused areas such as large roofs or landfills can be used sensibly and profitably.” With its many years of experience in the power plant segment and its wide range of services, including planning, installation, maintenance and monitoring, SOLON is the ideal partner for this.

About SOLON:
SOLON is a leading producer of high-quality solar power modules and solar systems for rooftop, roof integrated and greenfield installations. As a specialist in the development, construction, and maintenance of commercial and utility-scale solar systems, SOLON delivers complete turnkey power plants worldwide. With its subsidiaries in Germany, Italy and the United States, SOLON employs a total of approx. 600 people across the globe.

Contact:
SOLON Energy GmbH
Katrin Evers - Spokesperson
Phone: +49 30 81879-9302
press(at)solon.com
www.solon.com

  • LinkedInshare0
  • Facebookshare0
  • WhatsAppshare0
  • E-Mail

The development of the Science and Technology Park Berlin Adlershof was and is co-financed by the European Union namely by EFRE. This concerns infrastructure development like construction of technology centres. Furthermore EFRE is used for international projects.

  • © WISTA Management GmbH
  • Legal Notice
  • Privacy Policy
  • Social Media Guide
  • FAQ
  • Contact
  • Press
  • Newsletter
  • RSS
  • International
Member of:
Zukunftsort Adlershof Logo