• Skip to Page content
  • Skip to Management
  • Skip to Main menu
Adlershof - science at work
  • WISTA
  • WISTA.Plan
  • WISTA.Service
  • WISTA direkt
  • Search
    • de
    • en
  • Adlershof - science at work
  • Technology Park
    • Companies / Institutes
    • Science City in numbers
    • Direction / Maps
      • Bus / Train
      • By Car
      • Bicycle
      • Orientation / Maps
      • Trail of Thoughts
  • Newsroom
    • Overview
    • News
      • Social Media Stream
      • Success Stories
    • Events / Calendar
      • Adlershof Connect
      • Long Night of Sciences Berlin
      • Adlershof Research Forum
    • Adlershof Journal
    • Hot Topics
      • Grand Challenges
      • Circular Economy
      • Climate change mitigation
      • Digital infra­structure / 5G campus network
    • Photos / Flyer / Downloads
      • Magazine archive
    • WISTA-Editorial Staff
  • Science / Technology
    • Overview
    • Technology Centres
      • Photonics / Optics
      • Biotech­nology / Envi­ron­ment
      • Micro­systems / Materi­als
      • IT / Media
      • Renewable Energy / Photovoltaics
    • Non-university Research
    • Universities / Colleges
      • Humboldt-Universität zu Berlin
      • Services for Students
    • Young Talents / STEM / School Labs
    • Start-Ups
      • Adlershof Start-Up Centre IGZ
      • Adlershof Startup Lab
    • Networks / Management
      • Campus Club Adlershof
      • workhier! Academics Career Programme
      • WISTA Academy
  • TV / Media
    • TV and Movie Production
    • Media Services / Companies
    • News and Events
    • Filming Locations
    • Costume Hire
    • GDR Film Archive
    • Tickets / Booking
  • Properties
    • Overview
    • Real Estate Rent
      • Office Space / Workspace / Laboratories
    • Real Estate Offers
      • Commercial Properties
    • ST3AM Working Environments / Coworking
    • Residential
    • Construction
      • Building Projects
      • Architecture
      • Webcam
  • Service
    • Overview
    • Gastronomy / Leisure / Shopping
    • Jobs / Market
    • Social and Healthcare Facilities
    • WISTA-Business Services
    • Event Services / Guided Tours / Hotels
    • Facility Management
    • Downloads / Photos / Videos
    • Jobs for Refugees
  • Hood
    • Overview
    • History
    • Nature Park
    • Culture
    • Technology Park
    • Digital Tours
  • WISTA
  • WISTA.Plan
  • WISTA.Service
WISTA direkt
  • Technology Park
  • Newsroom
  • News

News

  • Overview
  • News
  • Events / Calendar
  • Adlershof Journal
  • Hot Topics
  • Photos / Flyer / Downloads
  • WISTA-Editorial Staff
  • Technology Park
  • Newsroom
  • News
12. December 2025

Flexibility could reduce electricity generation from gas-fired power plants by up to 45 percent by 2045

Analysis by BUND and Gaswende with calculations by RLI shows advantages of flexibility in the energy system

Illustration: Icons for electricity generation and storage

The German government is currently pushing ahead with the construction of new climate-damaging gas-fired power plants as part of its power plant strategy. A new analysis by the organizations Bund für Umwelt und Naturschutz Deutschland (BUND) and Gaswende, with calculations by the Reiner Lemoine Institute (RLI), highlights the advantages of a smart strategy for cost reduction, resilience, and the achievement of climate targets.

The analysis by BUND and Gaswende includes calculations by the RLI on the impact of flexibilities on the use of power plants with a view to the target year 2045. The calculations are based on the assumption that the German government’s current targets, such as the expansion of renewables and climate neutrality, will be achieved by 2045.

More resilient energy system and cost advantages

The results show that innovative flexibility options such as the use of battery storage, bidirectional charging of electric vehicles, or load shifting in industry significantly mitigate short-term and expensive peaks in the electricity system.

As a result, power plants will be used significantly less overall: according to calculations, electricity generation in power plants can be reduced by up to 45 percent by 2045 compared to a strategy that does not rely on flexibility. The operating hours of these plants will decrease by almost a third (32 percent). This brings cost advantages and makes the energy system more resilient because it reduces dependence on imports. Marginal prices – i.e., the prices set at any given moment by the most expensive generation unit still required – could be 12 percent lower on average over the year.

More information on the analysis on the BUND website.

More information on the project on RLI's project page.

Contact:

Reiner Lemoine Institute gGmbH
reiner-lemoine-institut.de

Mascha Richter
Project leader
+49 30 1208434-25
mascha.richter(at)rl-institut.de

Ilka Cußmann
Project leader
+49 30 1208434-20
ilka.cussmann(at)rl-institut.de

 

RLI press release, 11 December 2025

Research Renewable Energies Grand Challenges

Related News

  • Group of twelve people

    How can a successful transformation of the heat supply be achieved?

    RLI is part of a research project on climate-neutral development of the heating and electricity sector in Birkenwerder and Hohen Neuendorf
  • WISTA’s “Climate Resilience” Project Team in a meeting

    A Blueprint for Climate-Resilient Technology Districts

    A master plan for climate resilience is intended to prepare Adlershof, as well as other locations, for the future
  • Mascha Richter and Philipp Blechinger

    CommunitE Innovation project aims to strengthen nationwide citizen energy community

    Researchers from the Reiner Lemoine Institute provide advisory support
  • [Translate to English:] Karte Geoinformationen Reiner Lemoine Institut

    Data for the expansion of wind power and photovoltaic plants

    RLI publishes comprehensive package with potential areas
  • Map of Germany potential for wind energy © RLI

    PV and Wind Area Calculator shows potential for expanding renewable energies in Germany

    New online tool developed by Reiner Lemoine Institute on behalf of Agora Energiewende was published

Related Institutions

  • Reiner Lemoine Institut gGmbH (RLI)

Share this page

The development of the Science and Technology Park Berlin Adlershof was and is co-financed by the European Union namely by EFRE. This concerns infrastructure development like construction of technology centres. Furthermore EFRE is used for international projects.

  • © WISTA Management GmbH
  • Legal Notice
  • Privacy Policy
  • Social Media Guide
  • FAQ
  • Contact
  • Press
  • Newsletter
  • RSS
  • International
Member of:
Zukunftsort Adlershof Logo